SURFACE FLOW HYDRAULICS OF TAUNSA BARRAGE: BEFORE AND AFTER REHABILITATION

Show simple item record

dc.contributor.author Chaudhry, Z. A.
dc.date.accessioned 2023-03-14T05:22:26Z
dc.date.available 2023-03-14T05:22:26Z
dc.date.issued 2010-06-07
dc.identifier.citation Chaudhry, Z. A. (2010). Surface flow hydraulics of Taunsa barrage: Before and after rehabilitation. Pakistan Journal of Science, 62(2). en_US
dc.identifier.issn 0300-9877
dc.identifier.uri http://142.54.178.187:9060/xmlui/handle/123456789/18961
dc.description.abstract Taunsa barrage is one of the important diversion structures, built across Indus River. The barrage experienced ripping of downstream floor and damages to impact/friction blocks in 1959, just after one year of its completion. Similar damages were reported and subsequently got repaired in years 1962, 1986, 1994, 1998 and 2003. Excessive retrogression and consequently the sweeping of hydraulic jump were noted as the main reasons for the damages. Feasibility study on “Rehabilitation and Modernization of Taunsa Barrage” completed in Year 2005, proposed subsidiary weir with crest at EL424, to be constructed downstream of the barrage. The subsidiary weir location and crest level was finally fixed on the basis of physical model study carried by Irrigation Research Institute (IRI), Lahore, under the technical supervision of Punjab Barrages Consultants (Joint Venture of NDC-NESPAK in association with ATKINS Consulting Engineers, UK). Arguments have emerged regarding technical rationality of the provision of subsidiary weir downstream of Taunsa Barrage as rehabilitation structure. The surface flow analyses were carried out using computer software HEC-RAS to establish the location of hydraulic jump for various tail water level scenarios. This paper discusses the calibration of HEC-RAS model and the surface flow hydraulics of Taunsa barrage before and after its rehabilitation. The RAS model results indicate that under the existing condition (without subsidiary) the tail water depth was sufficient to develop hydraulic jump over the glacis. en_US
dc.language.iso en en_US
dc.publisher Lahore: Pakistan Association for the Advancement of Science en_US
dc.subject Jinnah barrage en_US
dc.subject rehabilitation and modernization project en_US
dc.subject subsidiary weir en_US
dc.subject two-step weir en_US
dc.subject HEC-RAS en_US
dc.title SURFACE FLOW HYDRAULICS OF TAUNSA BARRAGE: BEFORE AND AFTER REHABILITATION en_US
dc.type Article en_US